DRAMATICALLY IMPROVE COSTS, SCHEDULE, AND PREDICTABILITY OF CAPITAL PROJECTS

DCW’s Integrated Advanced Work Packaging Solution aligns every stage of the project lifecycle and improves your project’s productivity and predictability

Need a better way to align teams, plan and manage all stages of your construction projects?

DCW’s pioneering Integrated Advanced Work Packaging Solution combines 4D/5D interactive planning for collaborative scheduling to develop the path of construction; with tools to automate the creation and management of work packages and maintain an evergreen AWP virtual construction model. DCW has subject matter experts to address the many aspects of AWP including systems integration, data management, process consulting, and training – to deliver successful project and program outcomes.

Data is collected from multiple sources and combined into a single platform embodying a virtual construction model and enabling efficient alignment of engineering, procurement, and construction.

Decorative Image

OUR CLIENTS SAY

GLOBAL DATA STORAGE COMPANY

“The DCW team really understood our project delivery objectives to streamline the engineering design work to the path of construction through 4D planning, work packaging, and IWP stages of construction to compress the schedule and better manage the project.”

LEADING HEAVY CIVIL CONSTRUCTION COMPANY.

SAN ANTONIO, TEXAS, USA

Through your programmatic implementation of the AWP Best Practices on our large LNG export terminal project, you enabled us to accomplish in 4 days what others couldn’t do in 8 months

MAJOR CHEMICAL COMPANY.

MIDLAND, MICHIGAN, USA

We achieved over 60% wrench-time improvement on our construction project, setting a new benchmark for productivity. Structural steel wrench-time performance improved to 70% and piping wrench-time performance rose to 63%

OMAN PETROLEUM COMPANY.

OMAN, MIDDLE EAST

We were able to achieve a key milestone at the largest capital project in PDO’s history by completing the project two months ahead of schedule, at substantial savings

SUPER MAJOR OIL COMPANY.

HOUSTON, TEXAS, USA

It is amazing what can be achieved on large-scale projects if everyone has the same information at their fingertips, all the time. We can go in and pick a few pieces of pipe and it builds the packages in a quarter of the time it takes to build a manual package. It gives us everything that is required to execute the package

Upwards of 00 % Improved schedule predictability

Up to 00 % Reduced TRIR and DART rates

Up to 00 % Improved field productivity

Up to 00 % Reduction in total installed cost

The DCW Integrated Advanced Work Packaging Solution Enables You To:

  • Reduce total installed cost by 5 to 10 percent, depending on level of maturity.
  • Improve field productivity by 10 to 25 percent.
  • Reduce TRIR and DART rates by up to 30 percent.
  • Improve predictability in cost, schedule, and quality certainty.
  • Better align engineering, procurement, and construction.
  • Improve efficiency rate of installation.
  • Improve foreman performance, safety planning, and interactive planning.
  • Enhance the quality of field-based progressing and status visualizations of the plan vs. actual vs. as-is.
  • Complete projects on time.
top_section_image

ConstructSIM (CSIM) UPDATE 5 AVAILABLE EXCLUSIVELY THROUGH DCW.

Benefit now from an upgrade to ConstructSim (CSIM) Update 5, which can be deployed either on-premise or via the cloud. CSIM is the industry-leading Advanced Work Packaging (AWP) software first offered by Bentley Systems and now available only through DCW and it continues to be the construction work packaging and planning tool of choice for users worldwide.

WHAT ARE THE BENEFITS OF CSIM UPDATE 5?

  • Data configuration wizard interface
  • Data processing, initiation, and monitoring user interface
  • Support for multiple data administrators
  • Constraint management
  • Integration capability with other applications
  • Progress status visualization configuration for all disciplines
  • Engineering Work Package download improved to only process new or changed data
  • Better compatibility
  • Improved performance of frequently used managed commands
  • On-premise capability

 

bottom_section_image

Additionally, DCW has developed a new integration and conversion connector tool which bridges information between CSIM and SYNCHRO Pro, and SYNCHRO 4D.

BENEFITS OF DCW CONNECTOR FOR CSIM AND SYNCHRO:

  • Optimize the sequence between the packages using SYNCHRO
  • Creation of an automated IWP schedule
  • Progress packages through mobile field applications
  • On-premise capability